Kitchen flooring was my weekend challenge. First I had to cut and lay some 6mm concrete backer boards, prime with the (green) latex paint in preparation for laying the wire for the underfloor heating... Toasty!

The boards are fixed with adhesive and galvanised nails, it took longer to fit them than it actually did to tile the floor!!

The tiles are now in place and I will be tackling the grouting on Monday, giving the adhesive time to go off.

In the mean time we have also been painting the main living area which will be complete Sunday along with the hall way. This just leave the flooring to lay and the TV to mount.

Once that is done we can tackle the spare room.

Were still looking good for the end of November, possibly even the 3rd Weekend!!